ECL installed two water sprinklers with a capacity of 10000 litres at North Searsole OCP in the Kunustoria area

Eastern Coalfield Limited (ECL) installed two water sprinklers with a capacity of 10000 litres at North Searsole OCP in the Kunustoria area. Water sprinklers are an efficient way for mining operations to settle and reduce the risk associated with fugitive dust.

[metaslider id="122584"]
[metaslider id="347522"]